TMBC have agreed the Draft Local Plan, which has now gone out to public consultation.

The formal consultation period on the Draft Local Plan runs from 1st October – 19th November 2018.

Please let the Council know your views on the Borough Green Gardens development and quote site reference LP29 – Borough Green Gardens:

• Email – localplan@tmbc.gov.uk
• Post – Local Plan Consultation, Tonbridge & Malling Borough Council, Gibson Building, Kings Hill, Kent ME19 4LZ
• Online – https://tinyurl.com/TMBCLocalPlan

The Council’s latest timetable for delivery of the Local Plan is below (last revised in March 2018).

Please note, the month in which the letter appears is when that event is expected to happen. The coloured bars lead up to an event represent the time required for preparation. The Modifications stage is optional depending on the recommendations of the Inspector’s report.